Phase 1 Decommissioning

+ Indicates An Expandable Menu Item

Chapter Jump:
1 2 3 4 5 6 7 8 9 Appendixes



Phase 1 Decommissioning Plan
- Click here to download the entire version.
Appendix C

Front Matter & TOC
  Cover
  Table Of Contents
  Acronyms & Abbreviations
 
 
1.0 Introduction
1.1 Purpose
1.2 Scope
1.3
1.4
1.5 Decommissioning Criteria
1.6 Project Management & Organization
1.7 Health & Safety Program
1.8 Environmental Monitoring & Control
1.9 Radioactive Waste Management
1.10
1.11
1.12 Organization Of This Plan
1.13 Control Of Changes
1.14 References
 
2.0 Facility Operating History
2.1
 
 
2.2 Site Decontamination Activities (1996 - 2011)
 
2.3 Spills & Uncontrolled Release Of Radioactivity
 
  2.3.2 - Old Sewage Plant Drainage
  2.3.3 - The Cesium Prong
 
 
2.4 Prior Onsite Burials
 
 
  2.4.3 - Other Burial Locations
2.5 References
 
3.0 Facility Description
3.1
3.2 Population Distribution
 
 
3.3 Current & Future Land Use
 
  3.3.2 - Summary Of Anticipated Land Uses
3.4 Meteorology & Climatology
  3.4.1 - The General Climate Of Western New York
  3.4.2 - Severe Weather Phenomena
  3.4.3 - Weather-Related Radio nuclide Transmission Factors
 
3.5 Geology & Seismology
  3.5.1 - Regional Physiography
 
 
 
 
 
3.6
3.7
 
  3.7.4 - Unsaturated Zone
  3.7.5 - Description Of Unsaturated Zone Monitoring Stations
  3.7.6 - Physical Parameters
  3.7.7 - Numerical Analysis Techniques
 
 
3.8 Natural Resources
 
  3.8.2 - Mineral Resources
  3.8.3 - Water Resources
  3.8.4 - Timber Resources
  3.8.5 - Renewable Energy Resources
3.9 References
  Figures
 
4.1 Radiological Status Of Facility
  4.1.1 - Sources Of Available Data
 
  4.1.3 - Non-Impacted Facilities
 
 
4.2 Radiological Status Of Environmental Media
  4.2.1 - Data Sources
 
  4.2.3 - Radiological Status Of Surface Soil & Sediment
 
 
 
 
 
4.3 References
 
5.0 Dose Modeling
  5.1.1 - Applicable Requirements & Guidances
 
 
  5.1.4 - Potential Impact Of Long-Term Erosion
  5.1.5 - Potential Changes In Groundwater Flow Fields
 
  5.1.7 - Potential Impacts On The Kent Recessional Sequence
 
5.2 DCGL Development
 
  5.2.2 - Mathematical Model
 
 
5.3 Limited Site-Wide Dose Assessment
  5.3.1 - Basis For This Assessment
  5.3.2 - Assessment Approach
 
5.4 Cleanup Goals & Additional Analyses
 
  5.4.2 - Refining DCGLs and Cleanup Goals
  5.4.3 - Use of a Surrogate Radio nuclide DCGL
  5.4.4 - Preliminary Dose Assessment
  5.4.5 - Final Dose Assessment
5.5 References
 
6.0 ALARA Analysis
6.1 Introduction
6.1
6.2
6.3
6.4 Additional Analyses
6.5 References
 
7.0 Planned Decommissioning Activities
7.1
7.2
7.3 WMA 1 Proposed Decommissioning Activities
 
 
 
  7.3.4 - Removing the Above-Grade Portion of the Vitrification Facility
  7.3.5 - Removing the 01-14 Building & the Vitrification Off-Gas Line
  7.3.6 - Removing the Load-In/Load-Out Facility
  7.3.7 - Removing Other WMA 1 Structures
 
  7.3.9 - Site Restoration
7.4 WMA 2 Proposed Decommissioning Activities
 
  Figure 7-10 -. Conceptual Arrangement of WMA 2 Excavation, Plan View
  Figure 7-11 - Conceptual Arrangement of WMA 2 Excavation, Cross Section
7.5
7.6
7.7
7.8 WMA 7 Proposed Decommissioning Activities
7.9 WMA 9 Proposed Decommissioning Activities
7.10 WMA 10 Proposed Decommissioning Activities
7.11
 
 
  7.11.5 - Demolition of Structures
 
7.12
7.13 References
 
8.0 Quality Assurance Program
8.1
8.2
 
8.4 Document Control
8.5 Control Of Measuring & Test Equipment
8.6 Control Of Purchased Material & Subcontractor Services
8.7 Corrective Action
8.8 Audits & Surveillance
8.9 Quality Assurance Records
8.10 References
 
9.0 Facility Radiation Surveys
9.1
9.2
9.3 Background Surveys
9.4 Characterization Surveys
 
9.5 In Process Surveys
9.6 The Phase 1 Final Survey Status
 
9.7 The Survey Process By Waste Management Area
 
  9.7.2 - WMA 2 Low-Level Waste Treatment Facility
  9.7.3 - WMA 3 Waste Tank Farm Area
  9.7.4 - WMA 5 Waste Storage Area
  9.7.5 - WMA 6 Central Project Premises
  9.7.6 - WMA 7 NDA & Associated Facilities
  9.7.7 - WMA 8 State Licensed Disposal Area
  9.7.8 - WMA 9 Radwaste Treatment System Drum Cell Area
  9.7.9 - WMA 10 Support & Services Area
  9.7.10 - WMA 11 Bulk Storage Warehouse & Hydrofracture Test Well Area
  9.7.11 - WMA 12 Balance Of The Site
  9.7.12 - Environmental Media
9.8
9.9 References
 
Appendixes
  Appendix A
  Appendix B
  Appendix C
  Appendix D