West Valley Demonstration Project Nuclear Timeline


1954
The Federal Atomic Energy Act promotes widespread peaceful development and use of atomic energy. It encourages private industry to participate in reprocessing irradiated (used) nuclear fuel in an effort to commercialize the nuclear fuel cycle.

 

Dividing Line


1959
New York State establishes the Office of Atomic Development (OAD) to promote and coordinate the atomic industry within the state. The "Atomic Energy Plan for the State of New York" identifies nuclear fuel reprocessing as a viable commercial activity.

 

Dividing Line


1961

While industrial interests explore the viability of commercial reprocessing, the state of New York moves to acquire land in the town of Ashford, near West Valley, for an atomic industrial area. The state Office of Atomic Development establishes the Western New York Nuclear Service Center (WNYNSC) on the 3,345 acres of land it has taken title to.

 

Dividing Line


1962

Davison Chemical Company establishes Nuclear Fuels Services, Inc. (NFS) as a reprocessing company. It reaches an agreement with the state to lease the WNYNSC.

 

Dividing Line


1966

Nuclear Fuels Services develops and operates 200 acres of the WNYNSC. It operates the site as a nuclear fuel reprocessing center from 1966 to 1972, and accepts radioactive waste for disposal until 1975. During the operation of the plant, 640 metric tons of spent reactor fuel are processed, resulting in 660,000 gallons of highly radioactive liquid waste. The liquid waste is stored in an underground waste tank. NFS also utilizes a 15-acre area for the disposal of radioactive waste from commercial waste generators, and another seven-acre landfill is used to dispose of radioactive waste generated from reprocessing.

 

Dividing Line


1976

Following four years of pursuing modifications to the plant, NFS decides the costs and regulatory requirements of reprocessing make the venture impractical. The company decides to exercise its right to leave the site after its lease expires on December 31, 1980, transferring ownership and responsibility for the waste and facility to the state of New York. The state initiates talks with the Federal Energy Research and Development Administration to sort out ownership of the waste and environmental remediation responsibility.

 

Dividing Line


1980

Congress passes the West Valley Demonstration Project Act, Public Law 96-368, directing the U.S. Department of Energy (DOE) to take the lead role in solidifying the liquid high-level waste and decontaminating and decommissioning the facilities at West Valley.

 

Dividing Line


1982

The Department of Energy selects West Valley Nuclear Services, a Westinghouse subsidiary, to manage and operate the site. Control of the 200-acre developed site is turned over to DOE; the project is named the West Valley Demonstration Project (WVDP).

 

Dividing Line


1983

DOE selects vitrification, or the incorporation of high-level radioactive waste into glass, as the preferred method for solidifying the waste NFS left at West Valley.

Dividing Line


1984

The first non-radioactive glass is poured in a test canister at the WVDP. It marks the beginning of a five-year non-radioactive test program for vitrification.

 

Dividing Line


1987

The decision to dispose of low-level waste at the WVDP leads to a legal disagreement between DOE and the Coalition on West Valley Nuclear Wastes. The disagreement is settled by a Stipulation of Compromise, which states low-level waste disposal at the site and the potential effects of erosion on the site be included in a comprehensive Environmental Impact Statement (EIS) for Project completion. Compilation of the EIS is to begin the following year.

 

Dividing Line

1988

In preparation for radioactive vitrification, WVNS begins pre-treatment of the high-level waste. Solidification of the lower-level radioactive salt solution from the waste tank begins to reduce the amount of highly radioactive glass that will be produced. Waste pretreatment continues until 1995. 

 

Dividing Line


1996

Radioactive vitrification begins. The highly successful operation continues into 2001, emptying the high-level waste tank and producing 251 10'-foot-tall stainless steel canisters of hardened radioactive glass. The draft Environmental Impact Statement for site closure is released to the public for a six-month review period.

 

Dividing Line


1998

A Citizen Task Force (CTF) is convened to provide additional stakeholder input for the West Valley closure process. The CTF issues its report the following year, stating it finds the site unsuitable for permanent disposal of radioactive waste.

 

Dividing Line


1999

Vitrification Expended Materials Processing (VEMP), is initiated to begin processing unserviceable equipment in the Vitrification Facility. VEMP’s success helps in the development of a Remote Handled Waste Facility (RHWF) to process large-scale, highly-contaminated equipment excessed during decontamination and decommissioning activities.

 

Dividing Line


2000

The near completion of vitrification results in the restructuring of the Project workforce to support the new emphasis on decontamination and decommissioning the WVDP. Groundbreaking ceremonies for the RHWF are held.

 

Dividing Line


2001

The spent nuclear fuel assemblies are removed from the storage pool and placed in shipping/storage containers. Two significantly contaminated areas are decontaminated: the Product Purification and Handling Glovebox and the Acid Recovery Process Room.


Dividing Line


2002

Vitrification of the high-level waste is complete. This highly successful project results in 275 stainless steel canisters of solidified high-level waste, safe in storage and ready for transport to a disposal facility.

 

Dividing Line


2003

The shipment of the remaining 125 spent nuclear fuel assemblies is safely completed, allowing for the decontamination of the Fuel Receiving and Storage Area of the former reprocessing plant. Other projects include removal and treatment of the sodium-bearing wastewater from underground storage tanks, decontamination of the Product Purification Cell – South.  Initial debris from the General Purpose Cell and Process Mechanical Cell is removed and packaged. The Vitrification Cell Dismantlement Project is initiated.

 

Dividing Line


2004

Shipping low-level waste off-site for disposal is a major activity in 2004, with a record 104,427 cubic feet of low-level waste shipped for disposal. Footprint reduction begins with the removal of 20 office trailers from the site. Decontamination of four major cells (rooms) continues: Vitrification Cell, Process Mechanical Cell, General Purpose Cell, and Extraction Cell–2.

 

Dividing Line


2005

The Final Waste Management Environmental Impact Statement is approved. Low-level waste shipments for offsite disposal increase significantly. The triennial emergency exercise, TRIEX 2005, is held in July. The exercise, intended to evaluate the WVDP’s ability to respond to an offsite transportation incident, included participants from Cattaraugus County Emergency Services, the Cattaraugus County HazMat Response Team, the West Valley Volunteer Hose Company, Bertrand Chaffee Hospital, the Genesee & Wyoming Railroad, and the WVDP.  Site foot print reduction activities escalate, and the majority of site employees are moved to an off-site building.

Although great progress has been made in solidifying the high-level waste, much remains to be done before the Project can meet all the conditions of the West Valley Demonstration Project Act. The Department is striving to accomplish the majority of this work by 2010.

Dividing Line


General History

Until recently the West Valley Demonstration Project was one of five sites that reported to the Department of Energy Ohio Field Office. In May 2006 the West Valley Demonstration Project was transferred and now reports directly to the Department of Energy Headquarters, Office of Site Support and Small Projects. Project work is performed for the Department by West Valley Environmental Services (WVES). The WVES contract is a four year contract which was awarded on June 29th, 2007.


It is our hope that the Department of Energy’s West Valley web site will allow members of the public to better understand the accomplishments to date, the challenges that lie ahead, and the Department’s commitment to safe, cost-effective operation of this unique project.


In 1961 the state of New York acquired 3,345 acres of land in the town of Ashford, New York, near West Valley, for the Western New York Nuclear Service Center (WNYNSC). The next year Davison Chemical Company established Nuclear Fuels Services, Inc. (NFS) as a reprocessing company, and leased the WNYNSC.


NFS developed 200 acres of the land and operated a nuclear fuel reprocessing center from 1966 to 1972. 640 metric tons of spent reactor fuel were processed, with a plant capacity of 300 tons per year. The plant accepted radioactive waste for disposal until 1975.


During the operation of the plant 660,000 US gallons of highly radioactive liquid waste were generated. The liquid waste was stored in an underground waste tank. NFS also used a 15 acre area for the disposal of radioactive waste from commercial waste generators, and another seven acre landfill to dispose of radioactive waste generated from reprocessing.


In 1976 NFS decided the costs and regulatory requirements of reprocessing made the venture impractical. The company left the site after its lease expired on December 31, 1980, transferring ownership and responsibility for the waste and facility to the state of New York.


On October 1, 1980 the West Valley Demonstration Project Act, Public Law 96-368, was signed directing the U.S. Department of Energy (DOE) to take the lead role in solidifying the liquid high-level waste and decontaminating and decommissioning the facilities at West Valley. In 1982 The Department of Energy selected West Valley Nuclear Services (WVNS), a Westinghouse subsidiary, to manage and operate the site. Control of the 200 acre developed site is turned over to DOE; the project is named the West Valley Demonstration Project (WVDP). The next year vitrification, or the incorporation of high-level radioactive waste into glass, was selected as the preferred method for solidifying the waste NFS left at West Valley.


In 1987 The decision to dispose of low-level waste at the WVDP lead to a legal disagreement between DOE and the Coalition on West Valley Nuclear Wastes. The disagreement was settled by a Stipulation of Compromise, which stated low-level waste disposal at the site and the potential effects of erosion on the site be included in a comprehensive Environmental Impact Statement (EIS) for Project completion.


In 1996 Radioactive vitrification began. The highly successful operation continued into 2001, emptying the high-level waste tank and producing 275 10 ft  foot-tall stainless steel canisters of hardened radioactive glass.


In 1999 Vitrification Expended Materials Processing (VEMP) was initiated to begin processing unserviceable equipment in the Vitrification Facility. VEMP’s success helped in the development of a Remote Handled Waste Facility (RHWF) to process large-scale, highly-contaminated equipment excessed during decontamination and decommissioning activities. Groundbreaking ceremonies for the RHWF were held in 2000.